FEATURED PROJECTS

Check out some of our Freemium featured projects!

  • Fekola Gold Mine

    Gold

    FEKOLA GOLD MINE Mali NI 43-101 TECHNICAL REPORT Prepared for: B2Gold Corp. Prepared by: Mr Tom Garagan, P.Geo. Mr Peter Montano, P.E. Mr John Rajala, P.E. Mr Ken Jones, P.E. Effective date: 31 December 2019 CERTIFICATE OF QUALIFIED PERSON I, Tom Garagan, P.Geo, am employed as the Senior Vice President, Exploration with B2Gold Corp.

    Within the database are 2,969 auger drill holes (24,376 m), 1,166 rotary air blast (RAB) drill holes (24,064 m), 3,889 aircore drill holes (160,879 m), 2,733 reverse circulation (RC) drill holes (313,937 m), 246 holes pre-collared with RC collar and completed with a core tail (RC– core) drill holes (92,436 m), and 536 core drill holes (113,150 m). Of this total, there are 839 aircore drill holes (45,857 m), 500 auger drill holes (3,755 m), 66 core drill holes (12,919 m), 18 RC– core drill holes (5,236 m), and 591 RC drill holes (62,589 m).

    Friday, March 20, 2020

    B2Gold Corp.

  • Instagram
  • Facebook

©2020 by Prospector LLC